Electrical engineer routing cabling during a commercial refurbishment
Commercial Electrical Refurbishment

Commercial Rewires
Across Northern Ireland

A commercial rewire needs a clear scope, safe access and a practical plan for keeping the premises operating. CTS works with businesses, facilities teams and contractors to renew fixed wiring as part of an agreed electrical refurbishment.

Sport IrelandTranslinkEducation AuthorityAn PostSERC CollegeNorthern Ireland Fire and Rescue ServiceUlster UniversityUlster MuseumAllianz
CTS Electrical Services van outside commercial premises
Commercial Electrical Refurbishment
Planned Around your premises and operating hours
When A Rewire Is Being Considered

Start With The Installation You Have

An older installation, changing use of a building or repeated alterations may prompt a review of the fixed wiring. An Electrical Installation Condition Report can identify observations that need attention, but it does not automatically mean every circuit must be replaced.

CTS can review the available drawings, inspection findings and your plans for the premises before defining what should be retained, altered or renewed. The scope depends on the condition of the installation, the intended loads and how the site is used.

Circuit Renewal

Replace selected power or lighting circuits where the agreed design and condition assessment call for it.

Containment And Routes

Plan cable routes, containment and access with the building team, including the impact on finishes and occupied areas.

Alterations For New Use

Support a refurbishment, layout change or new equipment with circuits planned for the revised requirements.

Testing And Records

Inspect and test the completed work, then provide the appropriate certification for the work carried out.

NICEIC Approved Contractor and SparkSafe accreditations
AccessNI Vetted Engineers
Our Installation Process

A Rewire Planned Around Your Business

Occupied offices, shops and industrial premises need more than a wiring plan. Access, isolation and other trades need to be considered from the start.

01

Survey

Discuss the building, available records, intended changes and operating constraints.

02

Scope

Agree the circuits, routes, phases and any planned shutdowns before work begins.

03

Install

Coordinate the electrical work with the site team and other trades.

04

Verify

Complete the relevant inspection, testing and handover documentation.

Expert Insights

Installation FAQs

Not necessarily. The report identifies observations and their priorities. The right scope may be targeted remedial work, circuit renewal or a wider refurbishment after the installation is assessed.
We discuss access and operating hours during scoping. Phased work or planned isolation windows may be possible depending on the installation and site requirements.
Yes. The appropriate inspection, testing and certification for the agreed installation work form part of the handover.

Discuss Your Commercial Rewire