CTS engineer inspecting a commercial distribution board after an EICR
Electrical Advice

What Happens After an EICR?

A clear guide to understanding an unsatisfactory report, prioritising observations and planning electrical remedial work around your premises.

Clear Observation Codes
Prioritised Actions
Planned Access
Updated Records
Understanding the Report

An EICR Is the Start of a Clearer Action Plan

An Electrical Installation Condition Report records the condition of the fixed electrical installation at the time of inspection. If the report is marked unsatisfactory, the observation codes explain where action or further investigation is needed.

The next step is to turn those observations into a sensible scope of work. Urgent risks need prompt attention, while other improvements can be planned around access, budgets and the way the building operates.

C1

Danger Present

C2

Potentially Dangerous

FI

Further Investigation

Fixed wire testing equipment used during a commercial EICR

From Findings to Action

Each observation should lead to a clear priority, scope and record of the completed work.

Reading the Codes

What the Main EICR Observations Mean

Observation codes help the duty holder understand the nature of a finding. The report and the qualified inspector provide the context for deciding the next action.

C1 Danger Present

A danger is present and immediate action is needed to remove or control the risk.

C2 Potentially Dangerous

The finding is potentially dangerous and remedial action should be treated as a priority.

FI Further Investigation

Further investigation is needed because the inspector could not confirm the cause or full extent of a concern.

C3 Improvement Recommended

Improvement is recommended, but this code alone does not make the report unsatisfactory.

A Clear Scope of Work

Each relevant observation should be translated into a practical description of the work, access and expected outcome.

A Planned Programme

Where immediate danger is not present, work can be coordinated around agreed access and operational requirements.

CTS electrical testing at Lanyon Plaza in Belfast
Your Next Steps

What to Do After an Unsatisfactory EICR

A structured response keeps urgent matters visible and gives the business a clear record from the original finding through to completed work.

Read the overall assessment and every observation code

Follow the inspector’s advice where an immediate danger is present

Confirm whether further investigation is needed before work is priced

Group remedial work by priority, area and access requirement

Agree any isolation or shutdown arrangements before work begins

Keep the report, certificates and confirmation of completed work together

From Report to Completion

Four Clear Stages for Remedial Work

The exact response depends on the report, but the route from findings to reliable records should remain easy to follow.

01

Review

The report, observation codes and any supporting information are reviewed in context.

02

Prioritise

Urgent risks, further investigation and planned improvements are separated clearly.

03

Complete

The agreed work is coordinated around safe access and operational requirements.

04

Record

Relevant certificates and completion records are added to the site safety file.

CTS Electrical vehicle supporting commercial remedial work in Northern Ireland
Commercial Remedial Support

Plan the Work Around Your Building

CTS can review the findings, prepare a clear quotation and coordinate suitable electrical remedial work. Access, isolation and timing are agreed before work starts so the programme reflects how the premises operates.

Frequently Asked Questions

Clear Answers Before You Book

Not in every case. The response depends on the observations recorded. A C1 finding identifies danger present and needs immediate action. Other findings should be reviewed with the inspector so the correct priorities and controls can be agreed.

A report containing C1, C2 or FI observations is normally assessed as unsatisfactory. A C3 observation recommends improvement but does not make the report unsatisfactory on its own.

Where the safety of the installation allows, work can be planned around agreed access, quieter periods and operational requirements. Immediate dangers still need prompt action.

The paperwork depends on the work completed. It may include an Electrical Installation Certificate, a Minor Electrical Installation Works Certificate or other confirmation linked to the original observations.

The original report remains part of the site record. Relevant certificates and confirmation of completed work should be kept with it to show how the observations were addressed.

Request a Quote

Request a Free Quotation

Tell us about your premises and preferred timing. A CTS specialist will review your enquiry and contact you directly.

Speak to CTS

Commercial Support Across Northern Ireland

Talk directly to our Lisburn team about scope, access, testing or the best next step for your premises.

NICEIC and SparkSafe accreditations
Call Now Request Quote

Message Sent

Thank you for your enquiry. We will be in touch shortly.