Unseen Battery Failure
Emergency fittings may illuminate briefly but fail before the required duration is complete.

Book your August inspection while buildings are quieter, address priority findings and reopen in September with clear fire safety records.
August 2026 School Programme
Plan testing before pupils return and give your team time to act on any priority findings.
Trusted By Organisations Across Northern Ireland

The summer break creates a practical window to inspect key systems with less disruption. Our engineers can work through classrooms, corridors, assembly areas, kitchens and plant spaces while access is easier.
Testing supports your wider fire safety arrangements. It does not replace the premises fire risk assessment or the responsibilities of the person in control of the site.




Empty buildings, maintenance work and room changes can all affect the precautions relied on when pupils return.
Emergency fittings may illuminate briefly but fail before the required duration is complete.
Stored equipment, room moves and summer works can affect routes, signs and final exits.
Dust, building work, detector faults and panel issues can undermine confidence in the system.
Loose connections and overloaded distribution equipment can develop abnormal heat before visible failure.
Choose the services your school needs or ask us to plan a coordinated inspection across all four areas.
BS 5266
01Confirm escape-route, open-area and high-risk task lighting is ready to operate when normal power fails.
BS 5839
02Test the detection and warning system relied on by pupils, staff, contractors and visitors across the site.
BS 5306
03Check that extinguishers remain correctly selected, clearly positioned and ready for competent use.
Predictive Safety
04Find abnormal heat in live electrical equipment before the new term increases demand across the building.
A straightforward programme designed around school access, safeguarding and the September deadline.
Step 01
Tell us which buildings need attention, the services required and your available August access dates.
Step 02
We agree working areas, keys, alarm arrangements and any safeguarding or contractor controls.
Step 03
Our engineers complete the agreed checks with minimal impact on caretaking and summer works.
Step 04
You receive evidence of testing, prioritised findings and practical next actions before reopening.

CTS Fire & Security
Testing, Records & Practical Next Steps
Clear records help estates teams, principals and governors understand what was tested and what should happen next.
Relevant inspection and testing records
Asset-level findings where applicable
Priority grading for remedial actions
Practical advice from directly employed engineers
Coordinated planning for single or multi-site estates
A clear point of contact at CTS
Quieter buildings can make access easier, reduce disruption and leave more time to consider priority findings before pupils return in September.
Yes. We can coordinate testing across individual buildings or multi-site estates with one agreed programme and consistent reporting.
Yes. We agree access and system isolation arrangements in advance to reduce overlap with maintenance, cleaning and refurbishment work.
No. Inspection and maintenance records support your wider fire safety arrangements but do not replace the premises fire risk assessment or dutyholder responsibilities.
We record it clearly, explain the priority and provide practical remedial advice. Where suitable, CTS can also quote for corrective work.
CTS uses directly employed engineers and can plan visits around your safeguarding, access and contractor management requirements. AccessNI vetted engineers are available.
Northern Ireland fire safety guidance states that those responsible for non-domestic premises must assess fire risk and maintain appropriate precautions. For official guidance, visit NIFRS Business Fire Safety.
Request Sent!
A CTS Fire & Security specialist will be in touch shortly.
Share a few details and our team will recommend the right testing scope for your premises with clear costs before work is scheduled.
Select the required services and tell us your preferred August access dates. We will confirm scope, availability and costs before scheduling.